Standard 17.7
17.7 Credit line is in place and maintained with a financial institution or institution has a segregated contingency reserve equal to at least 10% of the operational budget.
Compliance:
The Institution has a Line of Credit of $250,000 at KS Bank, Wendell, NC. The 2016-2017 annual budget is $1,775,816; therefore, the line of credit exceeds the 10% required by TRACS.
Documentation: